Gwagwalada Township Water Reticulation

42km of HDPE reticulation, two 1,500m³ elevated tanks and 3,800 metered connections serving a township of 90,000.

The engineering challenge

Legacy asbestos-cement mains had a 60% loss rate and undocumented routing; excavation risked cutting the very supply residents depended on during works.

How we solved it

We ran new HDPE mains in parallel corridors with night-time tie-ins zone by zone, keeping supply live throughout. GIS as-builts and district metering were handed over with the works — the Board now measures losses below 12% and bills what it pumps.